Development of Utility Infrastructure for Europark Lubin – Water and Sewage Systems with Related Technical Installations

Scope of Work:

• Channel gate with electric actuator ZKa – 1.2 x 1.5 x 3.8 – Screen building – Raw sewage discharge station, facility no. 1a – 2 units

• Channel gate with electric actuator ZKa – 1.2 x 1.7 x 3.9 – Screen building – Raw sewage discharge station, facility no. 1a – 2 units

• Wall-mounted sluice gate with electric regulating actuator ZNa – 1.1 x 1.1 x 3.2 – Grit chamber (facility no. 2), Wastewater distribution chamber (facility no. 3) – 1 unit

• Wall-mounted sluice gate with electric regulating actuator ZNa – 1.1 x 1.1 x 3.2 – Grit chamber (facility no. 2), Wastewater distribution chamber (facility no. 3) – 1 unit

• Wall-mounted sluice gate with electric actuator ZNa – 0.9 x 0.9 x 3.1 – Distribution chamber KR1 – 1 unit

• Two-blade regulating overflow sluice gate ZPa – 1.6 x 1.2 x 3.1 with V-notch: upper blade with electric actuator, lower blade with manual actuator – Distribution chamber KR1 – 1 unit

• Wall-mounted overflow sluice gate with manual actuator ZPa – 1.62 x 1.25 x 2.7 – Stormwater pumping station, facility no. 10 – 1 unit

• Channel overflow sluice gate with manual actuator ZKa – 1.27 x 0.9 x 3.3 – Stormwater pumping station, facility no. 10 – 1 unit

• Two-blade overflow sluice gate with manual actuator ZPa – 1.3 x 0.6 x 3.2 – Main sewage pumping station with connection chamber, facility no. 8, 41 – 1 unit

• Two-blade overflow sluice gate with manual actuator ZPa – 1.35 x 1.6 x 3.3 – Main sewage pumping station with connection chamber, facility no. 8, 41 – 2 units

• Wall-mounted sluice gate with manual actuator ZNa – 1.36 x 1.4 x 3.4 – Main sewage pumping station with connection chamber, facility no. 8, 41

• Wall-mounted on/off sluice gate with manual actuator ZNa – 0.65 x 0.7 x 1.374 – Main sewage pumping station with connection chamber, facility no. 8, 41 – 1 unit

• Wall-mounted on/off sluice gate with manual actuator ZNa – 0.94 x 0.97 x 3.4 – Main sewage pumping station with connection chamber, facility no. 8, 41 – 1 unit

• Wall-mounted on/off sluice gate with manual actuator ZNa – 1.1 x 1.1 x 2.3 – Wastewater distribution chamber to clarifier 6c, facility no. 36a – 2 units

• Wall-mounted two-blade overflow sluice gate with sharp-edged weir: upper blade with electric actuator, lower with manual actuator ZPa – 1.66 x 1.55 x 3.4 – Wastewater distribution chamber to clarifier 6c, facility no. 36a – 1 unit

• Wall-mounted two-blade overflow sluice gate with sharp-edged weir: upper blade with electric actuator, lower with manual actuator ZPa – 1.63 x 1.48 x 3.4 – Wastewater distribution chamber to clarifier 6c, facility no. 36a – 1 unit

• Overflow sluice gate ZPa – 0.83 x 0.83 x 2.75 – Biological block, facility no. 5 – 4 units