Toggle music
Toggle music

Brzeg, Poland

Renovation of the aeration system involving the replacement of PIK300 diffusers in one aeration line at the KOCZ Wastewater Treatment Plant in Brzeg.

Scope of work:

• Preparation of the activated sludge chamber by removing residual wastewater mixed with activated sludge to a level that allows diffuser replacement while ensuring safe conditions for proper installation, including cleaning of the aeration grid.

• Dismantling of existing diffusers – 1090 units.

• Preparation of aeration grids for installation of new diffusers.

• Delivery and installation of new diffusers – 1090 units of AFD350-E manufactured by SSI.

• Disposal of removed diffusers along with membranes.

Scroll to Top

Ta strona korzysta z plików cookies w celu zapewnienia poprawnego działania. Możesz zapoznać się z naszą [Polityką prywatności]