Toggle music
Toggle music

Głębokie–Jaworze Complex, Poland

Construction works related to water and wastewater systems on the Drawsko military training ground

Scope of work:

  • Rod mixer with platform for the sludge thickener facility and effluent channel
  • OXY-DISC aeration system with compressed air pipeline
  • Sludge conveyors with integrated mixer
  • Combi U 1200-5000-6 grit chamber with bar screen, 300 m³/h capacity
  • 30 m³ lime silo with shafted screw conveyor
  • DN250 telescopic pipes (adjustable up to 1.0 m) with manual handwheel drive and mounting system
  • Basket screen 400x400x600 with manual winch and finger screen
Scroll to Top

Ta strona korzysta z plików cookies w celu zapewnienia poprawnego działania. Możesz zapoznać się z naszą [Polityką prywatności]